The Deptford Project

Brief

Design and build project comprising the refurbishment of a Grade II listed carriageway ramp including 16 arches to form commercial space. The construction of 3 new build timber framed townhouses, a new courtyard and the refurbishment of an existing building into 8 apartments with two restaurants to the groundfloor.

Scope of works

  • Refurbishment of Grade II listed carriageway ramp including interface with Network Rail and the Railway Trust
  • Refurbishment of 16 railway arches into commercial units and the formation of two walkways into the adjacent new build flats
  • Extensive public realm works, including granite setts, hard and soft landscaping, lighting and CCTV installation
  • Construction of 3 new build timber frame town houses, each with four bedrooms and external terraced areas
  • Formation of a new courtyard areas in steelwork with walkways, timber cladding, glazed brickwork, lift shaft and new lift
  • Façade retention and refurbishment of listed building (St Pauls House) into 8 apartments
  • New internal steel frame with metal decking and concrete to form floors
  • Installation of new zinc clad roof pod
  • Full MEP installation, including fire and security systems
  • Complete interior fit out, including kitchens and bathrooms through to full decoration

Sector:
Residential/Commercial

Client:
Cathedral Group

Value:
£5.5m

Programme:
12 Months

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com